The project involves the construction of 35 km of 2 x 2 lane motorway, 21 km of connection and side roads and engineering structures.
- Location Burgas / BULGARIA
- Client Ministry of Regional Development Roads Executive Agency
- Total Length of the Lot 35 km Main Road, 2 x 2 Lane
21 km Connection & Side Roads
- Excavation 3.850.000 m³
- Fill 1.965.000 m³
- Subbase and Base 550.000 m³
- Bituminous Pavement 215.000 m³
- No. of Bridges 3, L = 173 m
- No. of Arc Bridges and Culverts 5, L = 308 m
- No. of Overpasses and Underpasses 21, L = 786 m
- No. of Boxes and Pipe Culverts 59, L = 1.793 m
- Concrete 48.500 m³
- Pile Works 1.280 m
- Drainage and Collector Lines 1.278 m
- Landscape Works 820.000 m²