The project involves the construction of 1.844 m of 2 x 2 lane viaducts on Tanger Seaport Road: Lechbaa, Ksar Nord, Ksar Sud and Ghlal.
  • Location Tanger / MOROCCO
  • Client Société Nationale des Autoroutes du Maroc (ADM)
  • No. of Viaducts 4
  • Total Length of the Viaducts 1.844 m, 2 x 2 Lane
  • Max. Height of the Viaducts 40 m
  • Excavation 81.000 m³
  • Fill 186.000 m³
  • Pile Works 90.070 m³
  • Concrete 110.000 m³
  • Reinforcement 16.500 tons
  • Post Tension Reinforcement 900 tons
  • Formwork 190.000 m²