The project is being constructed in two consecutive stages in Aliağa District of Izmir. The project involves the construction of 700 m sheet pile quay with approximately 900 piles and wall structures by dolphin. After the completion of the project, the port will reach to a capacity to provide 24-hour services to container ships with a maximum capacity of 120.000 tons.

  • Location:Aliağa / Izmir / TÜRKİYE
  • Client: Petlim Limancılık Tic. A.Ş.
  • Construction of Tubular Steel Piled Quay: 700 m
  • Construction of Headwall Section: 142 m
  • Steel Pile Splicing Works: 2.544
  • Steel Pile Driving Works: 19,005 m
  • Pile Boring Works: 15.310 m
  • C40 Concrete: 4.288 m³
  • C30 Concrete: 30.620 m³
  • Steel Reinforcement: 11.227 tons