The project involves the construction of metro line with a total length of 5,05 km including 5 stations between Mumbai Train Station and Worli, and a double tunnel with a length of 3,55 km. Within the scope of the project, electromechanical works will also be performed.
  • Location Mumbai / INDIA
  • Client Mumbai Metro Rail Corporation Ltd.
  • Total Length of the Line 5,10 km
  • Length of the Tunnels 2 x 3,68 km
    (2 No.s TBM; Inner Diameter: 5,8 m)
    1,429 km - Cut & Cover
  • No. of Stations 5 - Cut & Cover
  • No. of Ventilation Shafts 4