The project involves the construction of a 720-meter long Cable-Stayed Bridge, approximately 1.90 km long approach viaducts and in total 5.40 km long road works including bridge, viaducts, approach roads and modifications on existing roads. The New Kremenchuk Bridge will be constructed near the Historical Kremenchuk Bridge which is the only road and railway bridge on Dnieper River passing through the city of Kremenchuk.
  • Location Kremenchuk / UKRAINE
  • Client Ukravtodor Poltava Region Directorate of Road Services
  • Total Length of the Road5.40 km, W = 28.35 m
  • Excavation 77,770 m³
  • Fill 475.000 m³
  • Plentmix Subbase 30.250 tons
  • Base Course 40.360 tons
  • Bituminous Base Course 87.600
  • Binder 86.300 m²
  • Wearing Course 89.000 m²
  • Concrete 150.000 m³
  • Bridge 720 m, W = 29.20 m