This project involves the construction of Şişli-Taksim transit line with a total tunnel length of 10,3 km which is the most critical section of the very first metro line in Turkey.
  • Location Istanbul / TÜRKİYE
  • Client Istanbul Metropolitan Municipality
  • Cross Section Tunnels - Horseshoe
    Shaft - Elliptic
  • Excavation Diameter Tunnels 3,8 - 8,3 m
    Shaft 8 x 12 m
  • Length of the Tunnels 10.253 m
  • Length of the Shaft 285 m
  • Excavation 465.000 m³
  • Concrete 105.600 m³
  • Shotcrete 51.400 m³
  • Steel Ribs 2.311.000 kg