The project involves the construction of two intersecting metro lines (10,9+6,95 km) including the supply and installation of electromechanical systems and commissioning works of 14 stations.
  • Location Istanbul / TÜRKİYE
  • Client Istanbul Metropolitan Municipality, Directorate of Rail Systems, Department of Transportation
  • Length of the Main Line 17,85 km - TBM and NATM
  • Length of the TBM Tunnel 25,37 km
  • No. of Stations 14 (6 + 8) - Full Underground
  • Earthworks 1.251.000 m³ - Deep Excavation
    768.000 m³ - NATM Tunnel Excavation
  • Shoring Works 144.000 m² - Deep Excavation
  • Structural Concrete 467.000 m³ 
  • Electromechanical Works Power Supply and Traction Power System
    Rigid Catenary System (RCS) Works
    Signalization System (CBTC)-UTO-SIL4
    Telecommunication Systems
    Escalators and Elevators
    Environmental Control Systems
    Emergency Tunnel Ventilation Systems