The project involves the construction of concrete gravity dam and hydroelectric power plant on Kızılırmak River with an installed power of 513 MW in three units and an annual power generation capacity of 1.500.000.000 kWh. The dam is 195 m high from the foundation and is the 5th highest dam of Turkey. This project is the largest investment in energy sector by a private enterprise in Turkey.
  • Location Samsun, Sinop, Çorum (Kızılırmak River) / TÜRKİYE
  • Client UDD - Boyabat Elektrik Üretim ve Tic. Ltd. Şti.
  • Purpose Power Generation
  • Type Concrete Gravity
  • Installed Capacity 3 x 171 MW = 513 MW
  • Annual Power Generation 1.500.000.000 kWh
  • Reservoir Volume 3.557.000.000 m³
  • Height of the Dam 195 m
  • Length of the Crest 299 m
  • Concrete 2.700.000 m³