The project involves infrastructure, superstructure, electrification, signaling, telecommunication and station works within the Yerköy-Kayseri High-Speed Railway Project.
  • LocationYerköy-Kayseri / TÜRKİYE
  • ClientGeneral Directorate of Investments (AYGM)
  • Total Length of the High Speed Railway Line2 x 139,55 = 279,1 km
  • No. of Stations2 (Yenifakılı and Şefaatli)
  • Earthworks48.227.276 m3
  • Bridge Works2.396 m
  • Cut and Cover Works3.205 m
  • Tunnel Works13.096 m Main Tunnel and 2.658 m Escape Tunnels
  • Train Speed300 km/h
  • Subballast Supply & Laying376.065 m3
  • Ballast Supply & Laying611.787 m3
  • Track Work with Ballast (Single Line)258.473 line-m
  • Track Work without Ballast (Single Line)32.392 line-m