The project involves infrastructure, superstructure, electrification, signaling, telecommunication and station works within the Yerköy-Kayseri High-Speed Railway Project.
- LocationYerköy-Kayseri / TÜRKİYE
- ClientGeneral Directorate of Investments (AYGM)
- Total Length of the High Speed Railway Line2 x 139,55 = 279,1 km
- No. of Stations2 (Yenifakılı and Şefaatli)
- Earthworks48.227.276 m3
- Bridge Works2.396 m
- Cut and Cover Works3.205 m
- Tunnel Works13.096 m Main Tunnel and 2.658 m Escape Tunnels
- Train Speed300 km/h
- Subballast Supply & Laying376.065 m3
- Ballast Supply & Laying611.787 m3
- Track Work with Ballast (Single Line)258.473 line-m
- Track Work without Ballast (Single Line)32.392 line-m