The project involves engineering works, environmental studies and construction works. Jetties design works, reclamation design works, site preparation design works, slope stability treatment design works, as built drawings, marine study, navigational study, posidonia oceanica monitoring, monitoring of sediment deposition, jetties works, reclamation works, site preparation works and slope stability treatment are being performed.
  • Location: Aliağa / Izmir / TÜRKİYE
  • Client: Star Rafineri A.Ş.
  • Contractor: TSGI Mühendislik İnşaat Limited Co. 

Jetty Construction

  • Total Length of Jetties: 1.178 m
  • Steel Pipe Piles: 37,450 tons
  • Pile Splice: 3.253 pcs.
  • Pile Driving: 14.518 m
  • Remedial Internal Boring / Drilling: 4.069 m
  • Rebar: 7.820 tons
  • C30, C40 Concrete: 39.345 m³
  • Underdeck Piping Works: 800 tons
  • Loading Arms Installation: 34 pcs.
  • Gangways and Fire Monitor Towers Ins.: 32 pcs.

    Reclamation Works

  • Length of Reclamation: 1.200 m
  • Jet Grout Installation
    (Ø 800 mm):
    236,585 m
  • Stone Column Installation: 104.382 m
  • Bored Pile Installation
    (Ø 1200 mm):
    35.641 m

    Site Preparation Works

  • Excavation: 408.468 m³
  • Filling: 84.960 m³
  • Bored Pile Installation
    (Ø 1200 mm):
    15.840 m