The project involves engineering works, environmental studies and construction works. Jetties design works, reclamation design works, site preparation design works, slope stability treatment design works, as built drawings, marine study, navigational study, posidonia oceanica monitoring, monitoring of sediment deposition, jetties works, reclamation works, site preparation works and slope stability treatment are being performed.