The project involves the extension of the current Sofia Metro, Line III Lot 4 from Shipka Street and Slatina District up to Tsarigradsko Street with a total length of 5.4 km TBM work, the design, and construction of the tunnel.
  • Location Sofia / BULGARIA
  • Client Metropoliten “EAD”
  • Cross Section TBM - Circular
  • Excavation Diameter TBM - 9,39 m
  • Length of the Tunnels 4.440m TBM
  • Earthworks 306.360 m³ - TBM Excavation
    55.5200 m³ - Shaft Excavation
  • Concrete 105.000 m³
  • Segment 3.103 Rings (6+1), 210.721 Segments
  • Shoring Works 3.500 m² - Diaphragm Wall
    13.600 m³ - Cement Grouting
    33.750 m - Bored Pile
    4.73600 m - Anchorage