The project involves the extension of current Sofia Metro, Line III Lot 4 in relation with Depot “Botevgradsko Shosse” Boulevard - VI. Vazov Boulevard, Central City Area, “Ovcha Kupel” District - Lot 4: km 11+966,34 (Start Shaft) - km 5+248,57 (Exit Shaft) Construction of TBM Tunnel.
  • Location Sofia / BULGARIA
  • Client Metropoliten “EAD”
  • Cross Section TBM - Circular
  • Excavation Diameter TBM - 9,39 m
  • Length of the Tunnels 6.717,77 m TBM
  • Earthworks 407.850 m³ - TBM Excavation
    105.000 m³ - Shaft Excavation
  • Concrete 108.000 m³
  • Segment 4077 Rings (6+1), 28.539 Segments
  • Shoring Works 3.500 m² - Diaphragm Wall
    24.900 m³ - Cement Grouting
    910 m - Bored Pile
    16.800 m - Anchorage