The project involves the construction of two dual-lane highway tunnels and a single-track railway tunnel, highway connection roads, railway and highway superstructure works between the districts of Hassa and Dörtyol in Hatay. The tunnel and connection roads works within the scope of the contract start from Iskenderun Karayılan District and end within the borders of Hassa Demrek Village. The 25 km long project will play a strategic role in passenger and freight transportation by connecting the Gulf of Iskenderun to the east of Hatay and the Southeastern Anatolia Region.
  • LocationHatay / TÜRKİYE
  • ClientGeneral Directorate of Investments (AYGM)
  • Route Length25 km
  • Tunnel Length57,5 km (1 x 19.5 km Railway ve 2 x 19 km Highway)
  • Tunnel SectionTBM and NATM
  • Tunnel Excavation DiameterRailway - 9,5 m, Highway - 13,1 m
  • Tunnel TBM Length26,4 km
  • Tunnel NATM Excavation Qty2.087.047 m3
  • Tunnel NATM Support WorksTunnel Shoring Qty - 15.652 tons and Forepoling and Bolt - 2.365.298 m
  • Concrete Qty562.381 m3(Shotcrete, final lining concrete and engineering structures)
  • Rebar Qty38,608 tones (Final lining concrete ve engineering structures)
  • Railway Superstructure27 thousand line-m
  • Highway Superstructure670 thousand m2