The project involves the construction and development works of the most critical part of 10,7 km of Al Rayyan Road. The works are being performed on a section of
5,3 km that stretches from the West of Olympic Roundabout to the West of New Al Rayyan Roundabout. Within the scope of the project, not only F106-B3-R5-R6-R7 and R8 junction structures including bridges and underpasses are being constructed and upgraded but also an electrical power station, a storm water drainage network and an intelligent transportation system, treated sewage effluent networks, electrical and telecommunication networks and landscaping.
  • Location Doha / QATAR
  • Client Public Works Authority (Ashghal)
  • Total Length of the Road 10,7 km, 4 x 4 Lane
  • No. of Interchanges 6
  • Excavation 3.000.000 m³
  • Fill 570.000 m³
  • Asphalt 745.000 m²
  • Concrete 1.300.000 m³
  • Reinforcement 142.000 tons
  • Kerb 50.000 m
  • Pipe Installation 112.000 m
  • Cable Installation 140.000 m